Design of a three-phase power supply circuit for a private house with 15 kW

In modern life, it is impossible to do without household appliances and electronic equipment, the number of which is constantly growing every year. This leads to an increase in energy consumption from the existing electrical network and the need to control its operating parameters. This issue is of particular importance in suburban housing, where it is allowed to use 380 Volts. For this reason, various options for connecting three-phase electricity in private homes are subject to serious research.

Do-it-yourself single-line power supply diagram | ProElectrika.com

Graphic display of power supply diagrams

A diagram is a graphical representation of the elements of a particular structure indicated in the drawing.
In addition, there are diagrams of electronic devices, including integrated ones, and presentation of any material in a simplified form. A single-line power supply diagram, for example, of a private house, is also no exception to the basic definition. Regarding the term “single-line power supply diagram,” we mean a graphical representation of the three phases of the power supply network connecting various electrical elements in the form of a single line. This introduction of a symbol greatly simplifies and makes power supply circuits less cumbersome. By definition, an electrical diagram is a document containing, in the form of symbols and images, the component elements of products, the principle of operation of which is based on the use of electrical energy and their connection with each other. The rules according to which all types of electrical circuits are implemented, including a single-line power supply circuit, are defined by GOST 2.702-75, and the implementation of digital electronics and computer technology circuits are determined by GOST 2.708-81. A conditional display of a three-phase supply voltage, for example, is shown in Figure “a”, and its simplified display, which was the reason for the appearance of single-line diagrams, is shown in Figure “b”.

In addition, to visually display a three-phase connection on the diagrams, several symbols are used, such as a crossed out line with the number “3” located next to the input or output of the wiring, and a straight line crossed out by three oblique segments. For single-line power supply diagrams, the designations of devices, starters, contactors, switches, sockets and other elements are used in accordance with GOST and European rules for the design, design and installation of electrical appliances.

The linear power supply diagram, examples of which are shown in Figures 1 and 2, displays the simplest connection and interaction of lighting elements, power supply and sockets for household appliances.

Industrial circuits for providing electricity to enterprises and connecting equipment do not differ fundamentally from a single-line power supply circuit for a private home or other structure.

Types of power supply schemes

When designing power supply systems, there are schemes of operational responsibility, balance sheet, executive and calculation, which are designed to reflect both the planned work and the existing system or the division of systems by consumers in order to establish safety boundaries.

Executive power supply diagram

is a document drawn up at an operating facility, reflecting the current state of networks, devices included in these networks, and recommendations for eliminating shortcomings and defects, if any were identified as a result of the appropriate set of measures.

In cases of designing new construction projects, a design installation diagram is drawn up. This element of a construction project includes a structural electrical diagram, a functional electrical diagram, an electrical installation diagram, and, if necessary, cable plans and schematic electrical drawings. In addition, if, for example, a power supply diagram for a cottage is drawn up, then, in accordance with the latest trends in suburban construction, a fire safety project is included in it.

Structural diagrams

represent general information about the electrical installation, expressed in indicating the interconnections of power elements, such as transformers, distribution boards, power lines, tie-in points, etc.

Functional diagrams

are performed mainly to abstractly transfer the functions of the mechanisms to which power is supplied, their interaction with each other and the impact on the overall situation from a safety point of view. Such projects are used mainly in the design of industrial facilities with a high occupancy of areas with machines, mechanisms and equipment, which can be indicated on the diagram in any way convenient for the designer. In addition, these documents often do not indicate the dimensions of objects, and they are not planning documents.

Schematic diagrams

It is customary to perform in accordance with GOST and standards in force in countries that were not previously part of the USSR. The standards in force in the global community meet the requirements of national manufacturers agreed with government agencies. These include IEC, ANSI, DIN and other standards.

Electrical network design

Based on the diagram for a private house, when preparing a detailed design of the electrical network, you will need to calculate the required number of groups, and then distribute consumers

In addition, it is important to decide on how to install the line and calculate the possible load on all devices connected to it

Choosing a wiring installation method

Let's start by choosing the method of installing the electrical network. Electrical wiring of a private house can be done in an open or hidden way. And not only the number of groups, wire cross-section and total installation cost, but also the appearance of the entire house depends on the right choice.

The photo shows exposed electrical wiring in a wooden house.

So:

  • First of all, we note that any type of wiring installation can be implemented in a house of any design and from any building materials. The only question is the cost of installation work. We will not provide installation standards for different types of wiring in different conditions. You can find this information in other articles on our website. Let's focus only on generally accepted norms.
  • Open wiring has found wide application in houses made of flammable materials. First of all, this is wood, SIP panels and other types of flammable building materials. For such houses, the cost of installing open wiring is often significantly lower. Hidden wiring will require considerable financial investment, and its installation is labor-intensive.
  • Hidden wiring is used mainly in houses made of brick, foam blocks and other non-combustible materials. After all, this type of wiring allows you to completely hide utility networks, while at the same time, in houses made of non-combustible materials, it does not impose any special requirements.

Calculation of the total load of the house

At the next design stage, you need to calculate the total load on the house and on individual electrical receivers. This is necessary for the subsequent formation of groups.

  • To do this, we first need to determine the number of electrical points and their maximum power consumption. This often becomes the most serious problem for non-professionals, but de facto there is nothing difficult about it.
  • Each socket or switch in the house is mounted for a specific electrical appliance or group of electrical appliances. We just need to select the most powerful of them and then carry out calculations for it.
  • The power of an electrical appliance can be viewed in the device passport. It may also contain an instruction manual. If you don’t have one or the other, then you can find out the approximate power in our table.

Table of power of electrical appliances.

But in most cases, the power of devices is indicated in Watts, and we need to convert it into Amperes. To do this, you can use Ohm's law - . In general, this is a simplified version of the formula, but for our purposes it is quite sufficient. Based on this formula, it turns out that an electrical appliance with a power of 1 kW for a 220V network consumes an electric current of approximately 4.5A.

Distribution of loads by groups

After we have calculated the total load in the house and for each individual electrical point, we can begin to directly create groups.

So:

According to clause 9.6 of VSN 59 - 88, the rated power of circuit breakers for powering group lines of sockets and lighting networks should not exceed 16A. Starting from this point, we distribute our loads into separate groups.

Scheme of a combined electrical group.

It is also worth remembering that it is not easy to install electrical wiring in a private house yourself. Therefore, you should not place different electrical receivers of the same group in different parts of the house.

Usually these are 1 - 2 adjacent rooms. Another aspect that is worth paying attention to is clause 7.2 of VSN 59 - 88. It requires connecting sockets in the kitchen and living rooms to different groups

Quite often, the kitchen outlet group also includes an outlet in the bathroom.

  • As a result, we can get from 3 to 7 groups depending on the total load. Some may end up with more than 10 groups. But here everything depends on the size of the house and the number of electrical appliances. But according to the technical conditions, the introductory circuit breaker, which is installed in a house, rarely exceeds the value of 25A, sometimes 40A.
  • This should be remembered when dividing the load into groups with your own hands. After all, the likelihood that all electrical appliances will work at the same time is quite low. Therefore, you should approach this issue soberly and perform the distribution more carefully, taking into account such a factor as the utilization rate.

Rules for distributing the load of machines

When distributing the load across 3 phases, you must adhere to the following set of rules:

  1. Power supply for lamps and sockets must come from different circuit breakers.
  2. Equipment in rooms with damp air (bathroom, kitchen, shower, bath) must be connected via its own switch.
  3. The power supply to outbuildings, street lights and sockets must be connected through a separate circuit breaker.
  4. The electric drive of gates, gates, and security lighting must be powered separately.
  5. The water heating and heating system must be connected through its own RCD.

Programs for drawing electrical circuits

But there are three main schemes of an electrical project, but on which not only the entire project is based, but also all future work of electricians or electricians. It is performed when there is a need to introduce serious changes to the project based on the results of an inspection of an existing electrical installation and the identification of inconsistencies with existing standards and rules. In addition to design and executive diagrams, single-line diagrams are as follows: structural – contain general data about the electrical installation, which is expressed in indicating the connections of power elements, in particular, transformers, power lines, tie-in points and much more; functional - they are made primarily for the purpose of abstractly conveying the actions of the mechanisms to which the power supply is connected; their interaction with each other and how they affect the general state of affairs from a safety point of view are also indicated. There are several wonderful free programs for drawing electrical circuits in a house or apartment in Russian: Electrical Compass. At its core, there are no particularly fundamental differences between them, with the exception of the purpose of each type

It is important to know that all specified elements and dimensions must be accurate and clear. Therefore, upon completion of the work, the customer receives not only a diagram, but also recommendations for eliminating defects identified during the inspection. Electrical installation work and safe operation of the electrical network will depend on such a scheme. There are several wonderful free programs for drawing electrical circuits in a house and apartment in Russian: Compass electrician

When compiled correctly, complete electrical and fire safety for people and objects is ensured.

New design technologies

Single-line diagrams can be executive and calculation. Depending on the type of electrical circuit, the stages of its creation will be different: In the executive electrical circuit, the first step in construction will be the compilation of calculation and computational materials. Up to the connection point, the electricity supplier and the network owner bear operational responsibility; after that, the electricity consumer bears operational responsibility. The calculated single-line electrical diagram is performed for new construction projects. These are automatic machines, RCDs, contactors, switches and other parts of the electrical network. Such a single-line power supply diagram for a particular residential or non-residential facility is a key document that is responsible for the operational responsibilities of different parties.

Single-line electrical diagram of power supply To simplify the drawings and their perception, various techniques are used. This connection is perfectly demonstrated by a single-line diagram of a KTP transformer: Photo - single-line diagram of a KTP transformer Examples of what a single-line typical power supply diagram of a clinic, apartment, country or country house, factory or other premises should include: The point where the object is connected to the electrical network; All ASU input and distribution devices; The point and brand of the device that is used to connect the room in most cases, the parameters of the shield are also needed; It is necessary not only to draw the power cable, but also to mark its cross-section and brand on the diagram; sometimes craftsmen mark the nominal value; The project must contain data about the rated and maximum currents of the equipment used at the facility. A general idea of ​​a linear power supply diagram. A diagram is a graphical representation of any structural elements indicated on the drawings. Electrical installation work and safe operation of the electrical network will depend on such a scheme.

But at the same time, single-phase wiring is indicated by one line with one stroke. It indicates everything that an electrician needs to install the electrical wiring of an apartment, except for connecting sockets and lamps at the installation site. The number in such a diagram is responsible for determining the number of phases, and the line crossed out by oblique segments is the definition of the phase. How to read electrical diagrams. Lesson #6

Electrical wiring test


Inspection and testing of electrical wiring
Upon completion of installation of electrical wiring, it is mandatory to check its functionality, which boils down to the following operations:

  1. First of all, you should “try on” the current and maximum power parameters selected by calculation to the actual operating conditions of electrical equipment.
  2. To do this, you will need to turn on all the electrical appliances indicated in the project at the same time and check the electrical wiring for heating of the insulation.
  3. If the conductors are slightly warm to the touch, and the circuit breakers do not constantly trip, we can say with confidence that all parameters have been selected correctly and the system is ready for normal operation.

When the test program is completely exhausted, they move on to the final arrangement of power supply elements. At the final stage, all contact connections in the mounting blocks are checked again and the operating limits of the RCD and voltage relays are set, adjusted based on the results of the test procedures.

Which circuit breakers to choose for the electrical panel

The main question that affects many users is: how to decide on slot machines? The rated current of the circuit breaker is calculated based on such parameters as the consumer’s load or its power.

For example. The rated power of simultaneously switched on electrical appliances and the lighting network will be 15 kW. There is a formula: P=U×I, where P is power, U is voltage, I is current. If P = 15000 W, then the current strength will be (rounded) 68 A. This means the sum of the rated values ​​of the machines should not exceed 68 A. But it should be remembered that a three-phase network is connected to the switchboard, so the rated amperes must be divided by 3, which will give approximately 23 A. This means that the input circuit breaker should be set to 25 A.

For lighting networks, it uses 6.3 or 10 A automatic machines. These are generally accepted standards, which are convenient to resort to to save time. If you still have free time, then you can calculate the amperage of the machine for light using the above formula, only P will be equal to the sum of the powers of all lamps used in a separate or common lighting line.

The amperage of automatic circuit breakers for power circuits should not be less than 16 A. It is this nominal value that will allow you to use electrical appliances uninterruptedly for a long time. If you install a circuit breaker with a lower rated threshold, then turning on the household appliance will be perceived by the device as a short circuit on the line and the circuit breaker will turn off the voltage.

There may also be more powerful electrical appliances in the house: hobs, ovens, refrigerators. And if several sockets can be combined into one group, then such devices will require the installation of a separate circuit breaker with a value of at least 25 A. The power of a modern electrical panel can reach 7 kW and higher.

Single-line power supply diagram for a private house

When developing the power supply for private houses, a single-line diagram is most often used as the most optimal option. It allows for simple design and installation, even in-house. The single-line diagram has proven itself to be effective and easy to use. At its core, it is a highly simplified circuit diagram, where all types of connections and network laying are made with one line of the same thickness. This is where the name single-line diagram came from.

There are two options for single-line diagrams - calculation and executive. The first option is used in the process of building a house. This diagram determines the procedure for installing cable lines at a specific facility and the selection of protective equipment. Calculations of all power loads on this network are preliminarily performed. The calculated single-line diagram indicates all available powers and their values. The location of the ASU must be noted. electrical panels are marked.

The executive diagram is carried out for existing electrical installations when the house has already been built. By this time, the results of a building survey have already been received from the design organization to prepare the most suitable location of all elements and power supply devices.

Determining the Best Energy Source

Choosing an alternative energy source for autonomous power supply to a residential building is a very important and responsible moment that requires a serious approach.

The most popular and most common options include:

  • generators running on diesel fuel or gasoline;
  • solar panels;
  • batteries of large volume and power;
  • hydroelectric systems;
  • wind energy converters.

Each source has its own unique characteristics and features. Owners should familiarize themselves with them in advance and, based on this information, determine the best option for a system that can satisfy all the electrical needs of a private residential building.

Single-phase and three-phase connection

There are many technical differences between single- and three-phase connections. For example, a three-phase connection is made using four or five wires. Of these, three are phase, through which current is supplied, and the remaining two are the neutral wire and grounding. In some cases, one common wire is used for neutral and ground.

When connecting using a single-phase circuit, two or three wires are used. This corresponds to phase zero and grounding. Using two wires means that neutral and ground are on a single conductor. Knowing the number of phases in advance, you can make calculations of the permissible power and determine the amount of electrical equipment that can be simultaneously connected to the network on each line.

In the case of a single-phase connection, all the supplied voltage is concentrated on one line, which often leads to overloads. The thickness of the wires on the internal lines of a home network is much higher than those used in a three-phase circuit. This is due to the higher load that falls on only one line. Taking into account all of the above factors, when installing power supply for a private home, preference is most often given to three phases.

Some useful tips for assembling a shield

When assembling an electrical panel, it is necessary to use only high-quality and reliable electrical products

You should not pay attention to cheaper Chinese analogues; personal safety is much more important

To connect wires to machines, it is best to use special lugs for crimping. Of course, then you will have to purchase pliers with which crimping is performed, but their cost is not too high.

The use of insulating tape is no longer relevant; many electricians use exclusively heat-shrinkable tubing. This consumable is convenient and reliable, and it is not necessary to purchase a hair dryer; you can use an ordinary lighter.

For ease of use, all elements of the electrical cabinet must be marked. Only then will it be possible to quickly and easily turn off the voltage in a certain room. You can make notes on the body of the device or make small signs and attach them to the product with tape.

Grounding 15 kW

Grounding device - a set of grounding conductors and grounding conductors ( PUE 1.7.19. )

In this case, protective grounding is done, which is performed for electrical safety purposes ( PUE 1.7.29. ).

Grounding is a circuit of metal corners 50x5x5 driven into the ground. At the customer’s request, we can equip the electrical installation with modular grounding rods to ensure the lowest resistance and increase the reliability of power supply. This design ensures the safety of electrical installations, appliances in the house, and protects people from electric shock.

AVR shields

The power supply system of a private home usually includes this element. AVR panels are designed to provide backup power in the event of a power failure in the main source. Additional inputs of these devices can be connected both to a fixed network and to a generator. There are these types of shields:

  • With first input priority. In this case, when the voltage disappears at the main input, switching to the backup one occurs automatically. If a current appears, the reverse process occurs.
  • No priority. Such devices do not automatically switch back to the main input when voltage appears on it. In this case, this procedure is performed manually.
  • With partitioning. In such devices, power is supplied through a system of switches installed at the inputs. If the voltage fails on any of them, the third switch begins to function, supplying voltage to de-energized consumers from the working input.
  • With DGU. In this case, when the voltage on both inputs fails, the generator starts. When main power is restored, the system returns to its original state. The power supply to a private home using this option will be uninterrupted in any case.

ATS shields, among other things, can differ in design. For a current of 25-160 A, wall-mounted models are used, for 160-400 A, floor-standing models are used. Cables enter and exit through a hatch at the bottom of the housing. The components are installed inside the cabinet on a special panel.

Who connects and where to get permission?

Before connection, an agreement is drawn up with the electrical network organization and the owner of the site. Connection should be made with equipment specially designed for this purpose - these are HEGEL 733 clamps up to 35 sq. mm

All work inside the site on wiring electrical cables is carried out by the owner of the site himself. After this, you will need to draw up a diagram of the location of electrical communications; if the network organization approves the work carried out, then within 30 days they are required by law to make the connection, with the issuance of documents.

Application and permission to connect to the city power grid:

What is the connection cost?

The cost of connection depends on the region; each region has its own tariffs, but on average it does not exceed 550 rubles for connecting to a 15 kW line. This depends on the distance to nearby power grids.

Initial data for design

Without going into technical details unnecessary for the customer, the entire process from making a decision about connection to receiving the finished project consists of two main parts:

  • Technical conditions (TU);
  • Technical specifications (TOR).

Specifications

Obtaining specifications is the first step towards a finished project. Technical specifications are issued by the energy supply organization upon written application. They describe in detail what can be done within the framework of SNiP and other regulatory documentation. To obtain technical conditions, the body responsible for the distribution of energy resources is provided with a number of documents:

  1. Electrical equipment layout diagram. It shows in general terms the arrangement of household appliances intended for installation in a private home.
  2. Linear power supply diagram. Provided only for houses with power consumption greater than 35 kW.
  3. Three-line diagram. Performed for 380V networks.
  4. List of power plants with a description of their power.
  5. Documents confirming ownership of the house.

There is an exception and relaxation for individuals who apply for a connection with a power of less than 15 kW. They just need to contact the energy supply organization with a passport and a list of household electrical appliances, which indicates their total power consumption.

In practice, there are cases when permission to connect was denied due to an overestimation of the required power. This needs to be monitored closely.

Technical task

Based on the technical conditions, you can draw up a technical specification. It will be the basis for the design. TOR can be compiled in three ways:

  1. The contractor, based on the customer’s words, draws up a technical specification. It is then signed by the customer and sent for execution.
  2. The customer independently draws up the technical specification and gives it to the contractor in signed form.
  3. The parties to the transaction jointly draw up the terms of reference.

The technical specifications for the design are drawn up based on the following data:

  • a detailed description of all equipment that is planned to be installed;
  • object location addresses;
  • architectural features of the building;
  • house plan with a description of the functional purpose of each room;
  • design project. It is carried out to fit the designed energy supply system into the exterior and interior.
  • individual wishes of the customer.

If the terms of reference are drawn up correctly and in detail, there is enough information in it for design. Electrical calculations will be performed correctly.

Connection procedure

Standard operating procedure:

  • concluding an agreement and obtaining technical specifications from the energy supply organization. An application and a list of documents specified above are submitted to obtain technical specifications;
  • receiving a commissioning certificate, which is issued by the district electrical network. This is preceded by the installation of a meter, an input distribution device and the laying of a cable from the energy consumer to the nearest power line;
  • Based on the input act, a “Act of delineation of balance sheet ownership” is issued. The document delineates responsibility for the operation of electrical networks;
  • obtaining a “Certificate of Compliance with Specifications” from the energy supplying organization after inspecting the meter and ASU;
  • connecting the cable from the power source to the input into the house. Produced only by an authorized body. Doing the work yourself is strictly prohibited.

Submitting an individual's application for technical connection

The first thing we think about is what to do and where to go. And you may not even need to go anywhere. Our task now is to submit an application for technological connection to a network organization, and this can be done electronically. Now every network is required by law to have a personal account for technical connection on its website, so why not take advantage of it?

However, not always and not everywhere everything goes smoothly, so it will not hurt to know that an individual can also submit an application for technical connection in person or by mail

Here it is important to know the following: the application must be sent to the network organization whose energy facilities are located closest to your site. That is, whose “pillars” stand near our house (even if there is no house yet), we turn to that network.

But what should you do if there are facilities of several network organizations around you? The question is far from idle, since this sometimes occurs even in small villages, often causing confusion in the orderly way of life of their residents. In this case, we can choose any network, provided that its objects are located within 300 meters from the boundaries of our site.

You must submit an application using a special form - an application form for an individual to connect to one source of power supply to power receiving devices with a maximum power of up to 15 kW inclusive. Filling out this paper can sometimes be challenging, so we've covered it in detail here.

Further interaction between the applicant and the network organization, according to current legislation, is carried out only through a personal account on the website of this network organization. After submitting an application, the network considers it within 3 days, and if any documents or information are missing, it must notify about this with the appropriate Notification. These materials must be provided within 20 working days, otherwise the application will be cancelled. If everything is in order with the documents, then the network organization is obliged to post the following documents in your personal account within 10 working days:

  • Terms of a standard TP agreement.
  • Technical specifications with a list of TP activities.
  • Instructions with a list of measures for safe actual connection and consumption for the applicant.
  • Account for payment of payment for TP.

After posting the documents, we have to pay the invoice within 5 working days, which in fact will mean concluding an agreement with the network organization. A classic agreement on paper does not need to be concluded either in person or in absentia, since such a procedure is not provided for by law. Within one business day after receiving information about payment of the invoice, the network is obliged to notify us about this.

Drawing up and approval of the project

The internal electrical wiring project for a private house consists of:

  • calculation of power, input devices and required wire cross-section;
  • calculation of grounding and lightning protection systems;
  • electrical wiring diagrams;
  • layout plan for cable lines and power equipment in the building;
  • estimates for consumables.

Such a full-fledged project of in-house wiring is done only under a contract with a specialized company with a license. If it then has to be approved by the electrical energy supplier, then the drawings and calculations made independently will not be accepted for consideration.

You can only make an electrical and/or wiring diagram yourself, which will facilitate the work when installing electrical wiring yourself. They schematically indicate protection devices and wire lines to simplify the preparation of estimates and assembly of the entire system.

House wiring diagram

Phase selection

One of the most important considerations in design and wiring diagrams is the type of input voltage. There is no need to analyze specifically here, such as, for example, the numerous pros and cons of a pile foundation. It can be single-phase or three-phase, 220 or 380 Volts. When choosing, you must proceed from the available capabilities of the supply transformer (which can be provided by power engineers) and current-consuming electrical equipment.

In other situations, when a private house does not exceed 100 square meters in area and does not have electric water heaters, you can get by with ordinary single-phase 220 V. The requirements for three-phase electrical wiring are higher. It costs more, but is not always needed. It should be taken into account that 380 V on three phases may be required in the future. And then the approvals will have to start all over again. Here everything needs to be weighed and foreseen in advance.

How to calculate power consumption when wiring

To calculate the total power consumption and the electrical wiring required for this at home, it is necessary to sum up the kilowatts of all household and lighting fixtures in the home. These parameters are available in equipment data sheets and in special tables. Plus, starting loads and 20% in reserve are added here.

The most energy-intensive in a cottage are instantaneous water heaters (about 4–5 kW), electric stoves with ovens (up to 3 kW), electric heaters (1.5–3 kW), vacuum cleaners (about 1.5 kW) and washing machines (about 2–3 kW). 2.5 kW). Ventilation in a private house also consumes a lot if it is made with supply and exhaust and heated air without a recuperator.

Average power consumption of household appliances

Light, especially if it is LED, requires relatively little (up to 0.5 kW). Televisions, computers and other household appliances currently consume approximately the same amount. But all this must be taken into account and added up in order to calculate the total power of the cottage. It is needed to obtain specifications and calculate the cross-section of electrical wiring.

How to calculate the carrying capacity of electrical wiring

Consumer groups

To ensure that the load in the intra-house network is distributed evenly, consumers are divided into several groups in the wiring diagram. For example, one goes to the street lighting of the local area, the second to the outbuildings, the third to the lighting fixtures in the cottage and the fourth to the sockets in it. If the house is large, then such a breakdown can be made by floors and rooms.

Main consumption groups

Each individual line has its own automatic circuit breakers and RCDs (residual current devices). This increases the safety of operation of the home electrical network and simplifies the search for problem points in the system when the protection is triggered. The electrical wiring diagram must indicate all protective devices and the current consumption on the circuit that is powered from each of them.

The group RCD and the wire cross-section behind it are selected so as to correspond to the consumption of a specific group. It is recommended to allocate your own power line for powerful equipment, but for other equipment the number of consumers should not be higher than 5–6 sockets. It is better to include more of them in the project, but with less risk of core burnout due to long-term overloads.

Features of the arrangement of the distribution panel


Three-phase metering board
Single-line diagram of a 15 kW 380V metering board (as a special case) is the most common option for constructing this part of the power supply system. When arranging it, the following configuration options are considered, taking into account the differences between single-phase and three-phase power supplies:

  • Using standard single-pole circuit breakers and RCDs (one for each phase) as protective equipment.
  • The use of only 4-pole differential devices in the circuit.
  • Installation of two-pole circuit breakers in the panel, supplemented with a cross-module and an RCD.
  • Installation of single-pole linear circuit breakers together with a 4-pole RCD and cross module.

Each of these options, if there is space in the panel, is suitable for arranging and connecting a full-fledged three-phase power supply system. The choice of a specific set of switching devices depends on the preferences and financial capabilities of the owner of a country home.

Three-phase connection

First of all, you need to prepare all the necessary documentation. It includes technical operating conditions that are issued by the organization that supplies electricity. Based on the technical conditions, design documentation for the electrical supply of the facility is drawn up.

You will need the following documents:

  • Agreement with the energy supply organization.
  • Inspection report of existing electrical equipment.
  • Conclusion of a laboratory study of a circuit designed for a specific object.
  • The act of delimiting electrical networks by balance sheet.

The project being drawn up takes into account the specifics of further electricity consumption. All consumers are divided into groups, which include sockets and lighting systems. Each group can be switched off separately if repair work is required. At this time, the other group continues to be used without causing unnecessary inconvenience to the owners.

For all groups, calculations of the maximum power consumption of electricity are performed. In accordance with this, the most optimal cross-section of conductors is selected. As a rule, lighting lines are laid with a cable whose cross-section is 1.5 mm2, and for sockets no less than 2.5 mm2 is required. Each group is connected to automatic protective devices that prevent fires in the wiring in the event of a short circuit.

Thus, if you have a connection project, you can calculate the need for materials, instruments and equipment, as well as determine the dimensions of the electrical panel in advance. The attached diagrams mark all the places where switches, sockets, stabilizing devices and other stationary equipment are located.

Direct connection can be made underground or overhead. As a rule, in private homes the second option is used, which has a number of significant advantages. In this case, you can use any connection diagrams with minimal time spent on completing the work. During further operation, overhead lines are much easier to repair. Of great importance is the cost of connection, which is much lower than when using an underground cable line.

When making an air connection, the distance from the house to the pole should be taken into account. which should not exceed 15 m. In the case where the distance is greater than specified, the installation of an additional pole is required. Due to this, severe sagging or breakage of the wire is eliminated under the negative influence of external factors

You should also pay attention to ensure that the wires do not interfere with pedestrians and vehicles. The mounting height of a three-phase line is at least 2.7 m or more

The wires themselves are installed on special insulators, and only then they are brought from the pole to the power panel.

It is recommended to install the power shield on the facade of the building, then the wires go from it to all rooms. If there are electrified extensions, the supply line is also supplied to them from the panel. To connect and account for consumed electricity, a three-phase meter is required. Mostly direct switching devices are used, the operating principle of which resembles a single-phase meter. In this case, you just need to correctly follow the device connection diagram located on its back cover or in the technical data sheet.

In some cases, a semi-indirect connection scheme for a three-phase meter can be used in a private house. The connection diagram is supplemented with a voltage transformer. To pay for consumed electricity, the device readings must be multiplied by the transformation ratio indicated on the transformer.

Main process

We immediately draw your attention to the fact that the article provides instructions for assembling a 220 V switchboard. If you want to assemble a three-phase switchboard, read the separate instructions to which we have referred!

Step 1 – Create a circuit

To begin with, you must create a connection diagram for all machines, meters and distribution buses in order to quickly and correctly assemble a distribution panel in an apartment (or country house). At this stage, you must also choose the most suitable location for installing each product on the DIN rail. The more compact and logical the machines are arranged, the more you will save connecting wires and make the box convenient for maintenance.

For your attention, here is an example of how a diagram for assembling a switchboard in a 220V apartment should look like:

In your version, everything may be completely different, and this will not indicate that the diagram was drawn up incorrectly. In each individual case, you can assemble a switchboard in your own way.

Step 2 – Prepare materials and tools

Among the tools you will definitely need:

multimeter (to test the wiring after connecting all the elements). a set of screwdrivers (tighten the screws on the terminals). an insulation stripping tool or, as a last resort, an electrician’s assembly knife. screwdriver (attach the box to the wall)

As for the elements of the circuit, you must choose everything yourself, depending on the total load on the electrical wiring, the voltage in the network (1 or 3 phases) and the branching of the created circuit. We recommend that you familiarize yourself with the following block of articles, which are closely related to self-assembly of a switchboard:

How to distribute the load across phases How to divide electrical wiring into groups How to draw up a wiring diagram before repair

After reading these articles, you can go to the store for suitable automation and materials, after which all that remains is to assemble the switchboard with your own hands.

Step 3 – Assembling the electrical panel

Now we come to the most important part of the article. Now that you already know what the “filling” of the box will consist of and how to select each of the products, you can proceed to assembly. One very important nuance should be noted right away - you must agree with energy sales representatives who will install the electric meter

If you are allowed to install it yourself, you can draw up the corresponding document and go to work

One very important nuance should be noted right away - you must agree with energy sales representatives who will install the electric meter. If you are allowed to install it yourself, you can draw up the appropriate document and go to work.

Step-by-step instructions for installing an electrical panel are as follows:

Hang the case on the wall (or install it in a prepared niche). Place the input wires and those coming from each room/powerful electrical appliances into the distribution panel. Strip the wires for a good connection to the terminals. Using self-tapping screws, secure a DIN rail inside the housing, which will serve as a fastener for assembling the entire “filling”. Secure all circuit breakers, RCDs and even the meter (if its mountings are appropriate) to the installed strip. Everything is simple here, the design of the shield includes a special latch that quickly and effortlessly snaps the product onto the rail. Install the neutral and ground bus. Cut the connecting wires into suitable lengths. Connect all the elements together according to the diagram. Do not forget that the input phase and zero for circuit breakers and RCDs must be connected to the upper terminals. We talked about how to connect machines in a panel in a separate article. Carefully check the quality of assembly of the distribution board, if necessary, re-tighten the screws on all terminals. Invite an energy sales representative to seal the electric meter. Check the correctness of the work performed by turning on the input machine.

If, after you turned on the electricity, the characteristic burning smell did not appear, sparking did not occur and the RCD did not trip, then all electrical installation work was completed correctly.

Visual video lesson of the entire basic process:

Correct assembly

Finally, we recommend that you familiarize yourself with some simple tips that will help you more correctly assemble a switchboard in an apartment or private house.

Some useful tips for assembling a shield

When assembling an electrical panel, it is necessary to use only high-quality and reliable electrical products

You should not pay attention to cheaper Chinese analogues; personal safety is much more important

To connect wires to machines, it is best to use special lugs for crimping. Of course, then you will have to purchase pliers with which crimping is performed, but their cost is not too high.

The use of insulating tape is no longer relevant; many electricians use exclusively heat-shrinkable tubing. This consumable is convenient and reliable, and it is not necessary to purchase a hair dryer; you can use an ordinary lighter.

For ease of use, all elements of the electrical cabinet must be marked. Only then will it be possible to quickly and easily turn off the voltage in a certain room. You can make notes on the body of the device or make small signs and attach them to the product with tape.